Phase 1 — Input · Phase 2 — Mapping · Phase 3 — Consolidation · Phase 4 — PO · Phase 5 — Cut Sheet · Phase 6 — Waste Analytics
Print to Cut ListOne Order. One Cut Plan.
Upload a wood-product print. The pipeline ingests your line items, dimension-parses them, maps them to standard lumber stock, globally consolidates identical cuts across every line, cross-references on-hand inventory, and issues a purchase order plus an operator-ready cut sheet — QDL-certified, end-to-end.
No Manual Math
No Double-Ordering
Brainless Wastage Reports
PDF & CSV Export
Adjacent Inventory Net
P01
Ingest
OCR + structured line-item extraction (PDF/image/CSV/TXT).
Idle
P02
Map
Parse dimensions → pick best-fit stock board from supplier table.
Idle
P03
Consolidate
Group identical cuts across all line items. Compute board-feet & waste.
Idle
P04
PO
Subtract on-hand inventory, issue purchase-order recommendation.
Idle
P05
Cut Sheet
Sort cuts by length DESC per stock group. Minimize blade swaps.
Idle
P06
WasteLog
Per-order + cross-order dashboard. Waste %, dollar waste, top offenders.
Idle
Ready. Drop a print, or use the seed example below.
Quick Paste — especially for CSV
Paste tab/comma-separated rows, "qty, item, dims" or freeform
Ingest Pasted Lines ⤳
Order Summary
—
Board Feet
0
cumulative stock demand
Est. Cost
$0
net of inventory
—
—
—
Download PO CSV
Download PO PDF
Download Cut Sheet CSV
Download Cut Sheet PDF
Sync Annotations ⤴
Inventory — Stock on Hand
Subtracted from PO at runtime. dim_key = thickness×width-length
Seed Defaults (1×)
Seed Stockroom (1x4, 1x6, 2x6, 4x4)
Waste by Stock Family
Top offenders
Top Wasteful Customers
Pricing & tolerance review
Recent Waste Log
From ai_cos_waste_log · 50 most recent